Under the button in the action bar, you can make further changes to your Gantt chart (Figure 1, “Button ”). |
|
|
You can edit default settings for task bars and milestones. In addition, you can edit the default settings that are applied on the chart in general. |
|
|
In the first section, you can set a font size for the rows and apply a specific height for bars and a size for milestones (Figure 2, “Row Font Size Settings”). To set another font size for rows, expand the drop-down menu next to Row Font Size and select a font size. Alternatively, use the buttons next to the drop-down menu to increase or decrease the font size. This font size is applied for all rows. In addition, the font size for the phases changes in relation to the row font size. By clicking on the button , the largest possible font size for the current chart size is applied on all texts in the Gantt chart. |
|
|
By default, the option is selected for the bar height and the milestone size (Figure 3, “Bar Height and Milestone Size Settings”). If you want to change this, select the other option and enter a new percentage into the input fields or use the symbols to increase or decrease the value. |
|
|
The percentage relates to the full row and phase height. If you choose a bar height of 100%, the bar will fill out the row in terms of height (Figure 4, “Example – Bar Height at 100%”). The same applies to the milestone size. |
|
Note
In some cases, it may be necessary to enlarge the bar width of your Gantt chart in order to display larger font sizes.
|
If you want to display the Gantt chart without using specific dates, switch the toggle button for to On (Figure 5, “Enable Generic Mode”). The time level axis and the date labels are adjusted accordingly. |
|
|
If you want to show overflow arrows in case a task or a milestone is outside of the defined calendar area, switch the toggle button for to On (Figure 6, “Enable Overflow Arrows”). |
|
|
By default, phases are displayed in your Gantt chart. If you don't want the phases to be displayed, switch the toggle button for to Off (Figure 7, “Enable Phases”). |
|
|
By default, leader lines are automatically added to labels which are placed outside of the default areas. If you do not want the leader lines to be added by default, switch the toggle button for to Off (Figure 8, “Enable Automatic Leader Lines”). You can also disable this setting for each label individually. |
|
Note
For further information regarding labels, see Use and Edit Labels.
|
If you are using a colorful slide and want the Gantt chart to be transparent, you can turn on the transparent background. To do so, switch the toggle button for to On (Figure 9, “Enable Transparent Background”). Your Gantt chart will then be displayed transparently and the slide background will be visible through the Gantt chart. |
|
|
Choose the option to enable or disable the two note areas in the Gantt chart (Figure 10, “Enable Notes Areas”). |
|
|
Expand the drop-down menu to define how you want to display different sections of your Gantt chart (Figure 11, “Choose Alternating Option”). The following options are available:
|
|
|
If there are multiple customizings for your company, you can switch between the customizings. To do so, choose the option (Figure 12, “Option ”). A dialog box opens. |
|
|
Expand the drop-down menu and choose the customizing you want to use for this chart (Figure 13, “Dialog Box to Change Customizing”). Then, click on the button . If there is only one customizing for your company, the option is grayed out. |
|
|
If you encounter any display issues in the chart, you can use the option to reload the chart and its content (Figure 14, “Option ”). Display issues should then be corrected automatically. |
|
Note
Alternatively, you can change the customizing for the whole presentation. To do so, click on the button in the group empower and then choose the option . A dialog box opens and you can choose a customizing.
Note
For further information regarding the switch of the default customizing, see User Settings.
|
In addition to the settings mentioned above, you can enter the manual edit mode. |
|
|
Manual edit mode should only be entered if you want to make final changes that cannot be made to an empower® Chart. In manual edit mode, you can edit the chart and its components freely. If you use manual edit mode and then leave it again, some formatting you have made in manual edit mode may be lost. |