General Information
The loading of empower® Chart Creation in the background after starting PowerPoint has been optimized.
The performance of very large line charts has been further improved.
The ribbon integration has been changed. If only empower® Chart Creation is installed, the ribbon group is located in the tab Insert in PowerPoint. If other empower® Products or Solutions are installed, empower® Chart Creation Ribbon elements are also located in the empower® Ribbon.
Gantt charts are now listed under the chart type Other and can be inserted via the button Charts in the simplified empower® Ribbon.
In the group empower in the Tab Insert and in the classic empower® Ribbon, all chart types including Gantt charts can be inserted via the button Insert Chart.
Further small improvements and bug fixes.
Comments
0 comments
Article is closed for comments.